TOP

visual banner part

Waste to clean water,
air and hydrogen

㈜이앤켐솔루션은 업계를 앞장서는 선두주자로서 최선을 다해 기술개발에 노력하고 있습니다.

Contribute to Carbon
Neutrality & Hydrogen Economy

㈜이앤켐솔루션은 친환경, 저탄소 경제로 전환을 위한 사업 및 기술 개발을 수행합니다.

solution part

Air Environment Solution

It minimizes various air pollutants from air pollutant discharge facilities, and provides a very effective solution for hydrogen sulfide reduction in hydrogen sulfide generating facilities.

Water Environment Solution

It minimizes various water pollutants from water pollutant discharge facilities, and provides solutions such as arsenic adsorbent and anaerobic digester stabilizer based on iron hydroxide-derived materials.

R&D

Through R&D that considers renewable energy and takes the lead in recycling resources, we have completed a number of certifications, including patents, new technologies, and innovative products. We are conducting continuous research activities to contribute to a 2050 carbon neutral and hydrogen economy-building society.

Construction part

Construction performance

Gunsan Public Wastewater Treatment Plant

1. Applied Technology/Product: Desulfurization Agent

2. Flow Rate: 7,000 m³/day

3. Inflow Conditions: Hydrogen Sulfide Concentration 3,500 ~ 5,000 ppm

4. Outflow Conditions: Hydrogen Sulfide Concentration Below 50 ppm

5. Supply Quantity: 20 m³

View more

Construction performance

Changwon City Food Waste Anaerobic Digestion

1. Applied Technology/Product: Pre-treatment equipment and desulfurization agent

2. Flow Rate: 16,560 m³/day

3. Inflow Conditions: Hydrogen sulfide concentration of 3,000 ppm

4. Outflow Conditions: Hydrogen sulfide concentration of 50 ppm

5. Desulfurization Tower Size (m³): 13 m³ x 3 units (2 desulfurization units, 1 standby unit)

6. Pre-treatment Equipment:

- Moisture Removal Unit

- Dust Removal Unit

- Desulfurization Unit

View more

Construction performance

Hongcheon Eco-friendly Energy Town

Hongcheon Eco-friendly Energy Town

1. Applied technology/product: desulfurization agent

2. Flow: 3,600 m3/day

3. Inflow conditions: 805 ppm hydrogen sulfide concentration

4. Outflow conditions: 0.00ppm hydrogen sulfide concentration

5. Performance standard: hydrogen sulfide concentration 5ppm or less

6. Desulfurization tower size (m3): 7 x 1ea

7. Remarks:

  1) City gas production

  2) Space velocity: 21.4hr-1

  3) replacement cycle : 6 months  

View more

Construction performance

Tancheon Water Regeneration Center

Tancheon Water Regeneration Center

1. Applied technology/product: pretreatment facility and desulfurization agent

2. Flow rate: 40,000 ㎥/day

3. Inflow condition: hydrogen sulfide concentration 902.5ppm

4. Outflow conditions: 0.00ppm hydrogen sulfide concentration

5. Performance standard: hydrogen sulfide concentration less than 10ppm

6. Desulfurization tower size (㎥): 12 x 3ea (2 units of desulfurization, 1 unit of desiloxane)

7. Remarks:

  1) Gas engine power generation

  2) Space velocity: 69.4hr-1 (desulfurization), 138.9hr-1 (desiloxane)

  3) Replacement cycle : 8 months 

View more

Construction performance

Chilsung Energy Yeoyang Farm

Chilsung Energy Yeoyang Farm

1. Applied technology/product: pretreatment facility and desulfurization agent

2. Flow: 12,000 m3/day

3. Inflow condition: hydrogen sulfide concentration 389ppm

4. Discharge conditions: hydrogen sulfide concentration 0.00ppm

5. Performance standard: hydrogen sulfide concentration less than 10ppm

6. Desulfurization tower size (m3): 5 x 2ea (one spare)

7. Remarks:

  1) Gas engine power generation

  2) Space velocity: 100hr-1

  3) Replacement cycle : 6 months 

View more

Construction performance

Chungju Food Bio Energy Center

1. Applied technology/product: desulfurization agent

2. Flow: 8,000 m3/day

3. Inflow conditions: 950 ppm hydrogen sulfide concentration

4. Outflow conditions: hydrogen sulfide concentration 0.01ppm

5. Performance standard: hydrogen sulfide concentration 5ppm or less

6. Desulfurization tower size (m3) : 5 x 2ea

7. Remarks:

  1) Hydrogen production

  2) Space velocity: 66.7hr-1

  3) Replacement cycle : 6 months 

View more

Construction performance

Iksan Sewage Treatment Plant

1. Applied technology/product: pretreatment facility and desulfurization agent

2. Flow: 13,200 m3/day

3. Inflow condition: hydrogen sulfide concentration 800ppm

4. Outflow conditions: hydrogen sulfide concentration 0.01ppm

5. Performance standard: hydrogen sulfide concentration 20ppm or less

6. Desulfurization tower size (m3): 5 x 2ea (Desulfurization), 4 x 2ea (Desiloxane)

7. Remarks:

  1) Transfer to drying facility

  2) Space velocity: 110hr-1 (desulfurization), 137.5hr-1 (desiloxane)

  3) Replacement cycle : 6 months  

View more

Construction performance

3rd stage sludge fuel conversion facility in

1. Applied technology/product: pretreatment facility and desulfurization agent2. Flow: 187,200 m3/day

3. Inflow condition: hydrogen sulfide concentration 77.6ppm

4. Outflow conditions: 0.00ppm hydrogen sulfide concentration

5. Performance standard: hydrogen sulfide concentration less than 10ppm

6. Desulfurization tower size (m3): 40 x 2ea (one spare)

7. Remarks:

  1) Dryer heat source

  2) Space velocity: 195hr-1, (78hr-1 by pressure)

  3) Replacement cycle : 3 months 

 

 

View more

Gunsan Public Wastewater Treatment Plant

Air

Changwon City Food Waste Anaerobic Digestion

Air

Hongcheon Eco-friendly Energy Town

Air

Tancheon Water Regeneration Center

Air

Chilsung Energy Yeoyang Farm

Air

Chungju Food Bio Energy Center

Air

Iksan Sewage Treatment Plant

Air

3rd stage sludge fuel conversion facility in

Air

E&Chem green newdeal part

Green New Deal 100 Promising Industries

Selected as a promising company for the Green New Deal in 2022 leading the green industry

The "Green New Deal 100 Promotion Support Project" is designed to support small and medium-sized enterprises with promising green technologies. From technology development to commercialization in order to foster as a leading company in the global green market. It is a project that provides up to 3 billion won in policy funds for three years throughout the previous period of growth. The Ministry of Environment and the Ministry of SMEs and Startups are collaborating and a total of 100 companies have been selected so far.